Difference: Run2Preparation (65 vs. 66)

Revision 662017-05-13 - mishino

Line: 1 to 1
 
META TOPICPARENT name="AtlasOperation"

Run-2 Preparation and 2017 Operations

<-- 
-->
Changed:
<
<

Updated Daily Run Plan from the control room - click here ***

>
>

ATLAS Daily Plan : "Plan of the DAY"

 
Changed:
<
<

P1 Run Preparation Activities:

>
>

Point-1 Google Calendar

  • the status for booking "ATLAS_partition (or MP)" (accessible only from GPN)
 
Changed:
<
<
Subsystems Requests for CTP or Tests in Global Partition (Google Calendar, visible only from GPN, no P1 network)

Milestone Weeks

Information and material of the 2016-2017 Milestone Weeks has been moved to this page.
>
>

Milestone Weeks (2014 -- 2017)

 

Data Preparation

Changed:
<
<
>
>
 

LHC Schedule

Changed:
<
<
Draft 2017 Schedule available here

2016 Schedule available here

>
>
  • Draft 2017 Schedule available here
 

Run-2 Shift Training Preparation Page

Changed:
<
<
Information for ongoing shift training preparation has been prepared here
>
>
  • Information for ongoing shift training preparation has been prepared here
 

Run-2 Operations Model/Shift Organization Discussion

Changed:
<
<
Please note that all of the material and links on Run-2 Operation and Shift Model has been moved to this page.
>
>
  • Please note that all of the material and links on Run-2 Operation and Shift Model has been moved to this page
 
Deleted:
<
<

Run-2 information for combined ATLAS - LHCf

Some information in preparation for the combined running with LHCf is collected on this page.
 
Deleted:
<
<

Beam Splash 2015 preparation

Step-by-step instructions for use by the Run Coordinators in setting up the beam splash combined run are on this page.

First Collisions at 450 GeV (May 6th 2015)

Step-by-step instructions for use by the Run Coordinators in setting up for first collisions at 450 GeV are on this page
 

Running ATLAS with ready For Physics in Quiet Beams

Changed:
<
<
Step-by-step instructions for use by the Run Coordinators in setting up for Quiet Beams are on on this page
>
>
Step-by-step instructions for use by the Run Coordinators in setting up for Quiet Beams are on on this page
 

Pending ATLAS Work requiring access to UX-15, US-15, Tunnel Sect 1-2, Sect 8-1

Pending requests for access are collected on this page
Line: 83 to 69
 
Changed:
<
<
>
>

obsolete

  • Beam Splash (2015) : Step-by-step instructions for use by the Run Coordinators in setting up the beam splash combined run are on this page
  • First Collisions at 450 GeV (May 6th 2015) : Step-by-step instructions for setting up the first collisions at 450 GeV are on this page
  • Combined ATLAS - LHCf : preparation for the combined running with LHCf is collected on this page.
 
META FILEATTACHMENT attachment="MilestoneWeek_Schedule_v2.pdf" attr="h" comment="M-Week Schedule version 2" date="1392044436" name="MilestoneWeek_Schedule_v2.pdf" path="MilestoneWeek_Schedule_v2.pdf" size="75964" stream="MilestoneWeek_Schedule_v2.pdf" tmpFilename="/usr/tmp/CGItemp28226" user="zimmerst" version="1"
META FILEATTACHMENT attachment="MilestoneWeek_Schedule_v3.pdf" attr="h" comment="M-Week schedule version 3 (Feb 10 2014)" date="1392044455" name="MilestoneWeek_Schedule_v3.pdf" path="MilestoneWeek_Schedule_v3.pdf" size="76926" stream="MilestoneWeek_Schedule_v3.pdf" tmpFilename="/usr/tmp/CGItemp28185" user="zimmerst" version="1"
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2021 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding ATLAS?Please contact the page author (see Topic revision above) or the Run Coordinator of the specific system.
Contact SysAdmins support only for technical issues