Run-2 Preparation and 2017 Operations
- the status for booking "ATLAS_partition (or MP)" (accessible only from GPN)
LHC Schedule
- Draft 2017 Schedule available here
- Information for ongoing shift training preparation has been prepared here
- Please note that all of the material and links on Run-2 Operation and Shift Model has been moved to this page
Running ATLAS with ready For Physics in Quiet Beams
Step-by-step instructions for use by the Run Coordinators in setting up for Quiet Beams are on on this page
Pending ATLAS Work requiring access to UX-15, US-15, Tunnel Sect 1-2, Sect 8-1
Pending requests for access are collected on this page
Open Issues from Daily Run Meetings and Operation
Pending open issues are collected on this page
Check
here for the for the instructions on shifting latency.
Useful online links (preliminary, these will be put in proper locations later, first link from GPN the second from P1)
obsolete
- Beam Splash (2015) : Step-by-step instructions for use by the Run Coordinators in setting up the beam splash combined run are on this page
- First Collisions at 450 GeV (May 6th 2015) : Step-by-step instructions for setting up the first collisions at 450 GeV are on this page
- Combined ATLAS - LHCf : preparation for the combined running with LHCf is collected on this page.
Topic revision: r67 - 2017-05-14
- mishino